Green Hydrogen in South Asia: Assessing Readiness for Scale
Green hydrogen has moved from concept to policy priority across South Asia. But the gap between announced targets and commercial reality remains wide. We assess the key bottlenecks.
India's National Green Hydrogen Mission, launched in 2023, set a target of producing 5 million tonnes of green hydrogen annually by 2030. Two years on, the mission has catalysed significant policy activity — production-linked incentives, electrolyser manufacturing targets, and pilot project approvals — but commercial-scale production remains elusive.
The fundamental challenge is cost. Green hydrogen produced from renewable electricity and water electrolysis currently costs $4–6/kg in India, compared to $1–2/kg for grey hydrogen produced from natural gas. Achieving cost parity requires a combination of lower renewable electricity costs, cheaper electrolysers, and higher utilisation rates — none of which is yet achievable at scale in the Indian context.
The most promising near-term applications are in hard-to-abate industrial sectors — fertiliser production, steel, and refining — where hydrogen is already used and where green hydrogen can substitute for grey hydrogen without requiring new end-use infrastructure. These applications offer a clearer path to commercial viability than the more speculative use cases in transport and power generation.
Explore more insights from our research team.
View all articles